Uncategorized

Where’d It Get That Name #2 – Passing the Horizon

Posted by | All Posts, Uncategorized | No Comments

How does one pass the horizon? The horizon is always out ahead of you, just at the edge of your vision. As you approach it, it moves farther away, like a dog chasing its tail.

What kind of name is this for a mountain bike trail?!?!

We had to ask Hans Jenny, Fellowship founder and Passing the Horizon trail builder, how this HTF classic got its name.

“Passing the Horizon is the name of a self-defense technique from my years of studying Kempo Karate,” said Hans. “I thought it described the trail perfectly at the time.”

How exactly this Karate technique applies to a mountain bike trail, we’re not sure. So the next time you see Hans out on the trail or at a Fellowship event, ask him to demonstrate the technique to you and maybe it’ll all make sense.

If you want to learn how to do it yourself, below is a video demonstrating this technique.

FOTW Pro Trail Crew Kicks Off June Dropping Berms

Posted by | All Posts, Trail News, Uncategorized | No Comments

Good news for all those Care Hills fans out there, especially the clergy of The Preacher.  On Wednesday, 6/6, the FOTW Pro Trail Crew went up Preacher and weed whacked the Vast trail and logging roads for easier climbing to the top of Preacher.  We replaced a 30” bridge that was tipping over and added a reroute to it near the bottom of Preacher above Crucible in a very consistently wet area. The new reroute flows better and keeps you dry heading into the rocky features on Crucible.

preacher bridge

After that, the Pro Trail Crew moved up Preacher and reshaped, rebuilt, and created more smooth-turning berms from the top of Preacher to Crucible.  Much like the revamped berms of Voodoo Child that were constructed last week. Normally these berms take anywhere from 4 -8 hours to build.  The Pros did 5 in one day. Way to go trail crew! Become a member so you can access the network map (you’ll need it) and plan a big ride out here soon (conditions permitting, of course).

Reshaped berms on Preacher!

Reshaped berms on Preacher!

Thanks to those who support the FOTW through their membership, especially those who purchase our 5-pack deal or above.  That type of support allows this highly skilled crew to get out there and get that type of work done in one day.  Spread the word to donate and support the trail crew for continued high-end construction. Thanks!

Carse Hills Trail Day and Updates from the Pro Trail Crew

Posted by | All Posts, Trail News, Uncategorized | No Comments

FOTW Volunteer Trail Day at Carse Hills
Where: Parking on Lincoln Hill Rd (Please drive 30mph and no dogs please)
When: 9 am – 12 noon
Why: Work On Henry’s Highlands to repair damage from logging operations
RSVP on Facebook

This Saturday from 9-12 the FOTW Pro Trail Crew and volunteers will be doing trail improvements to Henry’s Highlands. One group will start up the trail and improve knick outs and erosion areas for water to escape the trail. Then they will join the group up top on the ridge to finish connecting the trail.

The second group will hike to the ridge and begin working where the trail crew installed a bridge at the beginning of the area that was logged last season. Several areas will be rerouted to move the trail off the existing logging road that was created.

Please be prepared for bugs, sun and some hard work. FOTW will supply tools for mostly benching, clearing and creating run-off areas for water. Please bring sunscreen (no more trees so it’s very sunny at the top), bug spray, gloves,water and a snack. We think we can get the entire trail done by the time we leave. Then we can open the entire Carse network!

The entire network has had the leaves blown off, drainage opened up, bridges fixed on Preacher, 28 trees removed and trail pruning taken care of.  The only area that needs some TLC is Crucible which we will get to in the next two weeks. Some of the ramps and landings need replacing.

Carse Kids 2

This past week the FOTW Pro Trail Crew had 40 South Burlington Freshman students work for a half day improving trail tread, pruning and carrying all the wood for the bridge to the top of the ridge.  Thanks SBHS

Carse Kids 1

FOTW will supply snacks and beverages after we are done. We look forward to seeing you there.  Please bring a friend who may ride the area and who is not a member so they can see how much goes in to your trails.  Thanks everyone and look forward to seeing you.

A few notes about Parking at Carse Hills:

Our popular high end mountain bike network at Carse Hills bridges two roads; from the north Lincoln Hill and the south Hollow Road.  If riding up Henry Highlands, you will be on Lincoln Hill road,  please park well off to the side near the logging road entrance but DO NOT block the entrance in case a large truck needs to remove the existing logs at the platform.  There is an entrance sign there that allows you to know if the network is open or closed.  Also best if everyone could park facing west.  Be aware of cars, trucks and walkers up and down the road.  Be responsible as always and try to get into the field  as soon as possible as opposed to hanging in the road.

On the Hollow road side parking is a challenge. There is no parking at the gate entrance to the trails, no parking in that large lot below the gate and no parking east on Hollow road where the water outtake is for fire engines. Also the bump-out area on the Big Hollow Road where it intersects Hollow Road is also not a designated parking area.  The preferred and only legal area is 1.9 miles past the entrance headed east towards 116 on the right side.  There are now signs an it is a grassy flat area with gravel in the lot.

We are in discussion to open some of these areas up in the near future, so adhering to these guidelines will assist us greatly in this process.

Thank you for your help and as always be responsible and polite.

Join us or Renew your membership, and you can select Catamount Outdoor Family Center as an "add-on" for 2019! Join or Renew here